Eliminate the #1 Cause of Generator Failure Before it Becomes a Problem

8R Configurations

The SENS Approach

Starting battery failure remains the leading cause of generator failure in mission-critical environments. Yet most engine starting systems are still built the same way: separate batteries, separate chargers, separate racks, selectors, disconnects, cables, and conduits – all assembled and wired in the field.

SENS takes a system-level approach to DC power and engine starting, bringing engineering, assembly, and factory testing together to deliver pre-engineered, single-part-number systems. This creates highly reliable starting systems that vastly decrease or even eliminate the need for maintenance.

Instead of requiring field assembly of critical DC components, the SuperTorque® 8R is a single, engineered engine starting system that is designed, assembled, wired, and tested before it ever reaches your site.

Click image to enlarge.

Why Data Centers and Mission-Critical Operators Choose the SuperTorque® 8R

Supertorque8R field photo

Radically Improves Starting Reliability
An integrated architecture reduces failure points introduced by multi-vendor, field-assembled systems. 

Ships Preassembled and Pre-Wired
Arrives ready for drop-in installation, reducing field labor and commissioning risk. 

Saves Installation Time
On average, 6 hours saved per unit compared to installing individual components.

Frees Up Valuable Space
Up to 90% reduction in space compared to traditional systems.

Simplifies Specification and Procurement
Specify the entire engine DC system with a single part number.

Long-Term Confidence
Backed by a 10-year full warranty. 

Built for Mission-Critical Environments
UL listed
Seismic certified
Designed using our worst-case engineering methodology

Configured for Your Engine
One to four SuperTorque® 8Zs configured to accommodate space restrictions and power needs.