• Engine Starting Systems

    SuperTorque 8Z

    NiZn engine starting system

    SuperTorque 8R

    Integrated engine starting with rack/8Z/BBS/BSC/disconnects

    DC Power Systems

    PowerCab2

    24-300VDC, switchgear and industrial power system

    PowerCab

    24/48/120VDC, SCR

    MicroCab

    12/24/48VDC, switchmode

    Battery Chargers

    MicroGenius LE

    12/24VDC, 5-10A

    MicroGenius 2

    24/24VDC, 6-25A

    MicroGenius S2/S4

    12-120VDC, 6-100A

    EnerGenius DC

    120-240VDC, 6-800A, 3PH

    Battery Monitoring & Redundancy

    SC4 Battery Monitoring

    Comprehensive BMS for industrial and telecom applications

    Best Battery Selector

    BBS battery coupler

    BCS-120

    Control & alternator coupler

  • Applications

    Engine Starting

    Reliable DC power for engine starts

    Switchgear Power

    Backup power for critical switchgear

    Industrial DC Power

    Rugged power for industrial sites

    Battery Monitoring

    Battery monitoring systems and accessories

    Industries

    Data Centers

    Backup power infrastructure to maintain uptime

    Oil & Gas

    Power solutions for harsh environments

    Utilities

    Reliable power for grid operators

    Hospitals

    Backup power for life-critical systems

  • Support

    Technical Service & Support

    Get technical support

    Software Download Center

    Download firmware and software

    Software Revision History

    Updates to SENS software

    Warranties

    Product warranties and repairs

    Resources

    Technical Documents

    User manuals, CAD drawings, certifications, datasheets

    Insights

    Explore SENS power industry insights

    Case Studies

    Real world success stories

    White Papers

    Technical insights and innovations

    Genset Starting Education

    Prevent common genset starting failures

  • About

    About SENS

    Learn about our company

    Manufacturing

    U.S.-based manufacturing and scalable production

    Quality

    ISO 9001, worst-case design, codes & standards

    Partners

    Find a regional representative

    Company Updates

    News

    Company news and announcements

    Events

    Upcoming conferences and exhibitions

    Careers

    Working with SENS and open positions

Engine Starting Systems

SuperTorque 8Z

NiZn engine starting system

SuperTorque 8R

Integrated engine starting with rack/8Z/BBS/BSC/disconnects

DC Power Systems

PowerCab2

24-300VDC, switchgear and industrial power system

PowerCab

24/48/120VDC, SCR

MicroCab

12/24/48VDC, switchmode

Battery Chargers

MicroGenius LE

12/24VDC, 5-10A

MicroGenius 2

24/24VDC, 6-25A

MicroGenius S2/S4

12-120VDC, 6-100A

EnerGenius DC

120-240VDC, 6-800A, 3PH

Battery Monitoring & Redundancy

SC4 Battery Monitoring

Comprehensive BMS for industrial and telecom applications

Best Battery Selector

BBS battery coupler

BCS-120

Control & alternator coupler

Applications

Engine Starting

Reliable DC power for engine starts

Switchgear Power

Backup power for critical switchgear

Industrial DC Power

Rugged power for industrial sites

Battery Monitoring

Battery monitoring systems and accessories

Industries

Data Centers

Backup power infrastructure to maintain uptime

Oil & Gas

Power solutions for harsh environments

Utilities

Reliable power for grid operators

Hospitals

Backup power for life-critical systems

Featured Articles

NFPA110

Article

Healthcare Emergency Power: Reliability, Compliance & Risk

Switchmode_Article_Image

Article

What Switchmode Technology can do for Utilities

Support

Technical Service & Support

Get technical support

Software Download Center

Download firmware and software

Software Revision History

Updates to SENS software

Warranties

Product warranties and repairs

Resources

Technical Documents

User manuals, CAD drawings, certifications, datasheets

Insights

Explore SENS power industry insights

Case Studies

Real world success stories

White Papers

Technical insights and innovations

Genset Starting Education

Prevent common genset starting failures

Featured Content

Girtz_CaseStudy_WebsiteBanner

Case Study

How Girtz Industries Improved Their Engine Starting Tests

Mission_Critical_Power_2030_OnsiteGeneration

White Paper

What will the Mission for Critical Power Look like in 2030?

About

About SENS

Learn about our company

Manufacturing

U.S.-based manufacturing and scalable production

Quality

ISO 9001, worst-case design, codes & standards

Partners

Find a regional representative

Company Updates

News

Company news and announcements

Events

Upcoming conferences and exhibitions

Careers

Working with SENS and open positions

Latest News

Ribbon Cutting Cropped

NEWS

SENS Celebrates Colorado Expansion with Ribbon Cutting at New Longmont Manufacturing Facility

5 min read

How to Fix the Weakest Link in Generator Reliability: Fresh Thinking in Starting System Design

How to Fix the Weakest Link in Generator Reliability: Fresh Thinking in Starting System Design

 

System-level thinking is transforming how generator engine starting systems are designed, engineered, and delivered. With this approach, batteries and other components are no longer viewed in isolation, but as parts of an integrated whole that reduces the top threat to generator reliability.

What you’ll learn:

  • Starting systems are often the weakest link in generator reliability. Usually, it's the battery which fails, and could fail prematurely due to improper charging.
  • Typically, they're field-assembled from components sourced from multiple vendors, leading to chargers mismatched to the batteries.
  • The old approach exacerbates many of the issues commonly associated with genset batteries: rapid aging and an increased risk of catastrophic end-of-life failure.
  • System-level thinking is changing how generator starting systems are specified, engineered, and delivered. With this approach, starting system reliability is improved at the design stage.

Reliability is an absolute priority for any critical backup system. For emergency generators that ensure continuous power to hospitals and critical industries, it can be lifesaving.

What is the most common reason a critical generator fails to start?

Starting Systems Are the No. 1 Threat to Generator Reliability

While gensets have been improved and optimized over several decades, far less time has been spent engineering the DC systems that start and sustain them.

Typically, gensets are specified and commissioned at a system-level, ensuring components work together to meet precise customer needs. The DC battery starting system, however, is an afterthought.

That same system-level engineering approach is now extending to engine starting systems. To understand what that means in practice, it helps to examine how starting systems are typically commissioned today and why those conventional methods can lead to generator failure when they are needed most.

The Root Problem: Ignoring System-Level Design

All parts of a system must be coordinated, integrated, and work cohesively to ensure reliability. But while engines are factory-tested by the manufacturer, starting systems are often specified separately by third parties and later field-assembled.

Batteries, chargers, racks, disconnects, and wiring are sourced from multiple vendors, with different timelines creating complicated systems, crowded generator enclosures, and multiple failure points.  This often puts the installer in a bind to integrate separate parts in the field, under a deadline. 

Each component is carefully chosen to meet its design specifications. However, when bought and installed as individual parts, the system may not operate as efficiently as expected.

And where does this problem most commonly surface? Batteries.

As the NFPA's (National Fire Protection Association) Brian O'Connor points out, “If the batteries in a diesel generator fail, then the entire system will not operate; in fact, battery failure is the most common cause of generator failure.”

Widely Used Batteries Weren't Designed for Standby Genset Use

Conventional starting systems typically use a lead-acid flooded starting, lighting, and ignition (SLI)—the same battery used in cars and motorcycles.

These batteries are designed to deliver short-duration bursts of current followed by rapid recharging from a vehicle's alternator. However, this is different from what is expected in standby applications that operate under fundamentally different duty cycles. They can remain idle for months at a time, yet are expected to start instantly and reliably whenever power is lost.

Continuous Float Charging Shortens Flooded SLI Battery Lifespan

An engine starting battery cannot perform as intended unless it is fully charged. To ensure readiness, emergency and standby gensets are typically equipped with static battery chargers that maintain the battery at full charge. SLI batteries are continuously float charged to:

  • Compensate for self-discharge so the battery can provide cranking power in emergencies.
  • Supply power to DC-controlled genset switchgear and monitoring systems.

Field experience has shown that flooded lead-acid SLI batteries are not designed for continuous float charging. This operational condition can accelerate battery aging and reduce long-term reliability.

Why Flooded SLI Batteries Fail Suddenly in Starting Systems

Among the battery types used for generator engine starting, flooded lead-acid SLI batteries are the most common because of their low cost and widespread availability. However, in generator applications, these batteries typically last only half as long as they do in vehicles—about 2-3 years, compared with 5-6 years.

Genset operators know this and take preventative measures, typically replacing lead-acid SLI batteries every 2-3 years as required by NFPA-110 in highly critical applications.

Most drivers quickly recognize the telltale signs of a failing battery: a slight hesitation when starting the engine or a dashboard warning light. Engine cranking also becomes slower and weaker.

Continuous float charging, however, adds additional stress. Flooded lead-acid SLI batteries are made of numerous thin lead plates isolated by polyethylene separators and suspended in an electrolyte mix of sulphuric acid and water. In these hostile conditions, the polyethylene is already under stress. Float charging accelerates its deterioration, weakening the separators that isolate the battery’s thin lead plates.

One of the most common failure modes for flooded lead-acid SLI batteries under continuous float charge is separator failure. With electrodes no longer effectively separated, the battery is at risk of short-circuiting. When failure arrives, it arrives fast, often without warning.

The reason the same type of battery lasts about twice as long in your car is simple: in automotive applications, it is charged intermittently rather than kept on continuous float charge.

Should All Battery Types Be Intermittently Charged? 

This limitation does not apply to all engine-starting batteries. It is specific to flooded lead-acid SLI batteries.

For example, sealed valve-regulated lead-acid (VRLA) starting batteries designed for generator applications are intended to be continuously float charged with temperature compensation. When maintained according to manufacturer recommended settings, they do not exhibit the same deterioration associated with continuous float charging.

Although VRLA batteries are available for engine starting, they are less common and more expensive in the larger sizes used in common generator engines.

Other battery chemistries used for generator engine starting include nickel-cadmium (NiCd) and nickel-zinc (NiZn), each with their own specific charging requirements.

Systems Engineering Shifts Focus to the Entire Genset

A system-level engineering approach shifts the focus from individual components to how the overall design cohesively operates within the wider backup power system. This includes the end-to-end customer experience, from specification through commissioning and installation, operation, and maintenance.

In this framework, batteries are viewed as one part of an integrated DC starting system. How they are charged and operate is just as important as their unit specifications.

Modern, high-performance battery chemistries are reliable and designed to deliver high cranking power. They are also better able to withstand continuous float charging, with less risk of the catastrophic end-of-life failure common with flooded lead-acid SLI batteries. Their higher power density also makes them lighter, smaller, and more efficient for operators.

High-performance batteries can address many of the shortcomings of flooded lead-acid SLI batteries. But from a systems-engineering perspective, they are only one part of the overall solution.

Paired with high-performance batteries, a new generation of intelligent battery chargers is helping improve engine-starting system reliability. By continuously monitoring real-time operating conditions, these chargers can optimize charging performance in the same conditions that backup generators must perform without fail.

Figure 1 shows an engine-starting system that integrates a high-power NiZn battery with an onboard battery charger using a proprietary temperature compensated charge algorithm. The integrated charger is optimized for the NiZn battery's charging requirements, helping ensure the battery is ready to start when needed.

 
6a63bd587642b6e90d9848d2-fig1_generator_diagram_1

Figure 1: A traditional genset starting system setup versus a SENS complete factory packaged starting system. 

Because the battery and charger are factory integrated and optimized, it is backed by a 10-year warranty, which is an assurance that is difficult to achieve with disparate components assembled on-site. It is also up to 90% smaller than comparable lead-acid starting systems.

Factory-Integrated Systems Improve Commissioning and Delivery

By shifting from multi-vendor, field-assembled architectures to a whole-system approach, starting systems can be specified and commissioned as a complete package. This mirrors how gensets themselves are typically specified and commissioned.

With this model, DC starting systems are engineered to meet application requirements and assembled by a single manufacturer. Batteries, chargers, alternators, redundancy configurations, and DC connections are designed and tested as a coordinated system rather than as separate components sourced from multiple suppliers (Figure 2).

6a63bd5997eae12d75f29256-fig2_engine_starting_systems_checklist_1

Figure 2: An engine starting systems checklist with best practices for engine starting systems engineering and related benefits. 

The completed system is delivered factory assembled and tested, with charging parameters configured for the specific battery technology and application. This approach simplifies installation and reduces the integration challenges that can arise when components are selected and commissioned independently.

Consolidating system design and supply through a single source can also reduce coordination challenges across vendors, procurement schedules, and logistics. In standby power applications, reliability depends not only on how well a system performs in operation, but also on whether the right components are available, compatible, and ready when they are needed.

Conclusion

When backup generators fail, the consequences can be costly and, in critical sectors, even life-threatening. While starting system batteries are often identified as the primary point of failure, the starting system environment is frequently the underlying cause of shortened battery life and sudden catastrophic failure.

New charging technologies and fresh thinking about how systems are designed and commissioned are helping to minimize these risks. By approaching starting systems as an integrated whole rather than as a collection of individual components, systems engineering is improving generator reliability and helping ensure starting systems perform when they matter most.

Reference 

Stored Energy Systems Whitepaper: HELIX – Charging Technology Increases Genset Starting Battery Life & Cuts Risk of Catastrophic Battery Failure 

 

This article was first published in Machine Design. 

 

Critical Power Insights, Delivered

Quarterly updates, technical guidance, and industry news